Deprecated: Unparenthesized `a ? b : c ? d : e` is deprecated. Use either `(a ? b : c) ? d : e` or `a ? b : (c ? d : e)` in /nas/content/live/machadopatano/wp-content/plugins/groups/lib/wp/class-groups-wordpress.php on line 81

Deprecated: Unparenthesized `a ? b : c ? d : e` is deprecated. Use either `(a ? b : c) ? d : e` or `a ? b : (c ? d : e)` in /nas/content/live/machadopatano/wp-content/plugins/groups/lib/access/class-groups-access-meta-boxes.php on line 295

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nas/content/live/machadopatano/wp-content/plugins/revslider/includes/operations.class.php on line 2851

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nas/content/live/machadopatano/wp-content/plugins/revslider/includes/operations.class.php on line 2855

Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /nas/content/live/machadopatano/wp-content/plugins/revslider/includes/output.class.php on line 3708

Deprecated: Unparenthesized `a ? b : c ? d : e` is deprecated. Use either `(a ? b : c) ? d : e` or `a ? b : (c ? d : e)` in /nas/content/live/machadopatano/wp-content/plugins/flow-flow/includes/LABase.php on line 260
Biloxi Performing Arts Building , Biloxi, MS - M|P Machado Patano

OUR WORK

Biloxi Performing Arts Building , Biloxi, MS

M|P is currently designing a state of the art performing arts theater located next to the existing Biloxi High School. The building will have multiple 4-Pipe air handling units, fan coil units, and energy recovery units.
The 45,000 sq. ft. performing arts facility is to include a 950 seat auditorium with lobby, restrooms, catering room, stage/proscenium, fly area, orchestra pit, lighting and sound room, backstage changing and staging areas, scene shop, and associated storage rooms.

The project includes full electrical design, mechanical design, civil design, structural design, and architectural design. The electrical design includes: interior and exterior lighting, lighting control system, communications and data infrastructure, fire alarm system, surveillance system, and complete power system. M | P will provide the construction administration for this project.

SERVICES PROVIDED

  • Civil/Site Engineering Services
  • Mechanical Engineering Services
  • Electrical Engineering Services
  • Structural Engineering Services
  • Architecture Services from M|P Design Group
  • Surveying & Construction Layout Services
  • Construction Administration