Shipyard of the Future; FAB Shop Bay 4 Modifications, Huntington Ingalls Industries

This work is being performed in order to prepare Fab Shop Bay 4 for the new HGG Robotic Cutting Line. This “Shipyard of the Future” project includes placing a thick 6″ capping slab over the existing slab by installing dowels, two-way reinforcing and installing a bonding agent between the existing slab and capping slab. The project also includes installing a concrete cassette loading area and ramp for access by straddle carriers and fork lifts.

SERVICES PROVIDED

  • MEP Engineering
  • Structural Engineering
  • MP Design Group, PLLC